Call (956) 833-1305Request a walkthroughApartment turnover cleaning · Rio Grande Valley
Ready for the next resident.
Vacant units become ready for inspection or move-in through a repeatable room-by-room process, clear scheduling, final quality control, and documented completion—so the turnover stops depending on who showed up that day.
Start with a single unit · Completion photos on request · 24-hour correction on checklist items
For apartment teams
A repeatable unit-by-unit standard.
- Vacant-unit turnover cleaning on an agreed checklist
- Room-by-room standardized process, unit after unit
- Clear scheduling for inspections and resident move-in dates
- Support for one-unit trials and ongoing turnover relationships
What management gets back
Clear completion, not more follow-up.
- Final QC against the agreed checklist before release
- Completion documentation and photos when requested
- 24-hour correction guarantee on checklist items
- Insured service with a consistent point of contact
The unit checklist
Every unit runs the same way.
The checklist is agreed before the first unit and does not quietly change between turnovers. Special, heavy, unsafe, or out-of-scope work is reviewed in writing first.
- Kitchen. Cabinets and drawers inside and out, appliance interiors and fronts, counters, sink, and floor.
- Bathrooms. Tub or shower, tile, glass, fixtures, mirror, vanity inside and out, toilet, and floor.
- Living and bedrooms. Walls spot-cleaned, closets, shelving, baseboards, blinds, sills, outlets, and switch plates.
- Floors. Vacuumed, swept, and mopped after everything above it is finished.
- Detail pass. Light fixtures, vents, door frames, hardware, and anything the checklist calls out.
- Final walk. A supervisor check against the agreed unit checklist before the unit is released.
Turnover scopes vary by property. The checklist above is the ClearNest starting point and is adjusted to your make-ready standard during the walkthrough.
Walkthrough to ready
Start small, then repeat.
- 01Walk the unit
Review condition, access, key handling, and the readiness target.
- 02Set the checklist
Confirm rooms, tasks, turn window, and what documentation you want back.
- 03Clean and QC
Room-by-room execution, then a final check against the agreed standard.
- 04Document completion
Completion confirmation and photos, so nobody has to re-inspect blind.
Ready to make turnovers routine?
Request a walkthrough, or hand us one unit and judge it on the result.